Appendix I - Summary of Site Audit

 

Date

Contract No.

Observation

Follow-up

02/03/2018

SCL 1109

Dusty materials should be covered properly.

Dusty materials still not covered properly. (Remark as observation on 9 March 2018.)

02/03/2018

SCL 1109

Stockpile should be covered properly.

Stockpile still not covered properly. (Remark as observation on 9 March 2018.)

02/03/2018

SS A501

Stockpile should be covered properly.

Stockpile still not covered properly. (Remark as observation on 9 March 2018.)

09/03/2018

SCL 1109

Dusty materials should be covered properly.

Dusty materials still not covered properly. (Remark as observation on 16 March 2018.)

09/03/2018

SCL 1109

Stockpile should be covered properly.

Stockpile still not covered properly. (Remark as observation on 16 March 2018.)

09/03/2018

SCL 1109

Stockpile should be covered properly.

Rectification/improvement was observed during the site inspection on 16 March 2018.)

09/03/2018

SCL 1108

Stagnant water should be cleared to prevent pest.

Stagnant water was still observed. (Remark as observation on 16 March 2018.)

09/03/2018

SCL 1123

Dusty materials should be covered properly.

Stockpile still not covered properly. (Remark as observation on 16 March 2018.)

09/03/2018

SS A501

Stockpile should be covered properly.

Rectification/improvement was observed during the site inspection on 16 March 2018.)

16/03/2018

SCL 1109

Dusty materials should be covered properly.

Dusty materials still not covered properly. (Remark as observation on 23 March 2018.)

16/03/2018

SCL 1109

Stockpile should be covered properly.

Stockpile still not covered. (Remark as observation on 23 March 2018.)

16/03/2018

SCL 1108

Stagnant water should be cleared to prevent pest.

Rectification/improvement was observed during the site inspection on 23 March 2018.)

16/03/2018

SCL 1123

Dusty materials should be covered properly.

Stockpile still not covered. (Remark as observation on 23 March 2018.)

23/03/2018

SCL 1109

Dusty materials should be covered properly.

Dusty materials still not covered properly. (Remark as observation on 29 March 2018.)

23/03/2018

SCL 1109

Stockpile should be covered properly.

Rectification/improvement was observed during the site inspection on 29 March 2018.)

23/03/2018

SCL 1123

Stockpile should be covered properly.

Stockpile still not covered. (Remark as observation on 29 March 2018.)

23/03/2018

NKIL 6527

Accumulated waste should be cleaned frequently.

Accumulated waste was still observed. (Remark as observation on 29 March 2018.)

23/03/2018

NKIL 6563

Black smoke was spotted.

Black smoke was still observed. (Remark as observation on 29 March 2018.)

23/03/2018

KL/2015/03

Dusty materials should be covered properly.

Rectification/improvement was observed during the site inspection on 29 March 2018.)

23/03/2018

20150362

Accumulated waste should be cleaned frequently.

Rectification/improvement was observed during the site inspection on 29 March 2018.)

23/03/2018

20150362

Stagnant water should be cleared.

Rectification/improvement was observed during the site inspection on 29 March 2018.)

23/03/2018

KL/2011/01

Designated area should be assigned for waste collection.

Rectification/improvement was observed during the site inspection on 23 March 2018.)

23/03/2018

KL/2012/03

Drip tray should be provided for chemical substance.

Rectification/improvement was observed during the site inspection on 23 March 2018.)

29/03/2018

SCL 1109

Dusty materials should be covered properly.

Dusty materials still not covered properly. (Remark as observation on 6 April 2018.)

29/03/2018

SCL 1123

Stockpile should be covered properly.

Stockpile still not covered. (Remark as observation on 6 April 2018.)

29/03/2018

NKIL 6527

Accumulated waste should be cleaned frequently.

Accumulated waste was still observed. (Remark as observation on6 April 2018.)

29/03/2018

NKIL 6563

Black smoke was spotted.

Black smoke was still observed. (Remark as observation on 6 April 2018.)

29/03/2018

SCL 1109

Dusty materials should be covered properly.

Stockpile still not covered. (Remark as observation on 6 April 2018.)

29/03/2018

KL/2015/02

Dusty materials should be covered properly.

Rectification/improvement was observed during the site inspection on 6 April 2018.)


Appendix I - Summary of Site Audit

Date

STT No./TGLA No./Unoccupied Area (Lands Department)

Observation

Follow-up

02/03/2018

UGL near Gate 6

Skips should be properly covered to avoid dust nuisance.

Skips were still not covered. (Remark as observation on 9 March 2018.)

02/03/2018

UGL near Gate 6

Accumulated waste should be cleaned regularly.

Accumulated waste was still observed. (Remark as observation on 9 March 2018.)

02/03/2018

UGL near Gate 6

Accumulated waste should be cleaned regularly.

Waste was still observed. (Remark as observation on 9 March 2018.)

09/03/2018

UGL near Recycling site

Skips should be properly covered to avoid dust nuisance.

Skips were still not covered. (Remark as observation on 16 March 2018.)

09/03/2018

UGL near Gate 6

Accumulated waste should be cleaned regularly.

Accumulated waste was still observed. (Remark as observation on 16 March 2018.)

09/03/2018

UGL near Gate 6

Accumulated waste should be cleaned regularly.

Rectification/improvement was observed during the site inspection on 16 March 2018.)

09/03/2018

UGL near Gate 6

Dust suppression measures should be provided to haul road.

Dusty haul road was still observed. (Remark as observation on 16 March 2018.)

16/03/2018

UGL near Recycling site

Skips should be properly covered to avoid dust nuisance.

Skips were still not covered. (Remark as observation on 23 March 2018.)

16/03/2018

UGL near Gate 6

Accumulated waste should be cleaned regularly.

Accumulated waste was still observed. (Remark as observation on 23 March 2018.)

16/03/2018

UGL near Gate 6

Dust suppression measures should be provided to haul road.

Dusty haul road was still observed. (Remark as observation on 23 March 2018.)

23/03/2018

UGL near Recycling site

Skips should be properly covered to avoid dust nuisance.

Skips were still not covered. (Remark as observation on 29 March 2018.)

23/03/2018

UGL near Gate 6

Accumulated waste should be cleaned regularly.

Accumulated waste was still observed. (Remark as observation on 29 March 2018.)

23/03/2018

UGL near Gate 6

Dust suppression measures should be provided to haul road.

Rectification/improvement was observed during the site inspection on 29 March 2018.)

29/03/2018

UGL near Recycling site

Skips should be properly covered to avoid dust nuisance.

Skips were still not covered. (Remark as observation on 6 April 2018.)

29/03/2018

UGL near Gate 6

Accumulated waste should be cleaned regularly.

Accumulated waste was still observed. (Remark as observation on 6 April 2018.)

 

 



描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.02\Followup\follow 4.JPG

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.02\Followup\follow5.JPG

Date: 02/03/2018

Contract: SCL 1109

Date: 02/03/2018

Contract: SCL 1109

Observation: Dusty materials should be covered properly.

Observation: Stockpile should be covered properly.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.02\item for KTD\ssa501-stockpile should be cover.jpg

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\1109a  Dusty materials should be covered properly..jpg

Date: 02/03/2018

Contract: SS A501

Date: 09/03/2018

Contract: SCL 1109

Observation: Stockpile should be covered properly.

Observation: Dusty materials should be covered properly.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\CA9 1109 Stockpile should be covered properly..jpg

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\1109b  Dusty materials should be covered properly..jpg

Date: 09/03/2018

Contract: SCL 1109

Date: 09/03/2018

Contract: SCL 1109

Observation: Stockpile should be covered properly.

Observation: Stockpile should be covered properly.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\1108 Stagnant water should be cleared to prevent pest.jpg

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\1123 Dusty materials should be covered properly..jpg

Date: 09/03/2018

Contract: SCL 1108

Date: 09/03/2018

Contract: SCL 1123

Observation: Stagnant water should be cleared to avoid pest.

Observation: Dusty materials should be covered properly.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\ssa501-stockpile should be cover.jpg

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.16\item for KTD\Item 4 Dusty materials should be covered properly..JPG

Date: 09/03/2018

Contract: SS A501

Date: 16/03/2018

Contract: SCL 1109

Observation: Stockpile should be covered properly.

Observation: Dusty materials should be covered properly.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.16\item for KTD\Item 5 Stockpile should be covered properly.JPG

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.16\item for KTD\Item 6 Stagnant water should be cleared to prevent pest..JPG

Date: 16/03/2018

Contract: SCL 1109

Date: 16/03/2018

Contract: SCL 1108

Observation: Stockpile should be covered properly.

Observation: Stagnant water should be cleared to prevent pest.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.16\item for KTD\Item 7 Dusty materials should be covered properly.JPG

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\follow up photo 4.JPG

Date: 16/03/2018

Contract: SCL 1123

Date: 23/03/2018

Contract: SCL 1109

Observation: Stockpile should be covered properly.

Observation: Dusty materials should be covered properly.

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\follow up photo 5.JPG

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\follow up photo 7.JPG

Date: 23/03/2018

Contract: SCL 1109

Date: 29/03/2018

Contract: SCL 1123

Observation: Stockpile should be covered properly.

Observation: Stockpile should be covered properly.

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\I7-7NIKL6527 accumulated waste should be cleaned frequently.jpg

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\I8-NIKL6563 black smoke was spotted.JPG

Date: 23/03/2018

Contract: NKIL 6527

Date: 23/03/2018

Contract: NKIL 6563

Observation: Accumulated waste should be cleaned frequently.

Observation: Black smoke was spotted.

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\I9-KL201503-the stockpile should be cover.jpg

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\I10-20150362 accumulated wastw should be cleaned regularly.jpg

Date: 23/03/2018

Contract: KL/2015/03

Date: 23/03/2018

Contract: 20150362

Observation: Dusty materials should be covered properly.

Observation: Accumulated waste should be cleaned frequently.

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\I11-20150362 stagnant water should be cleared.jpg

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\follow-up\KL201101(same weekly)\KL201101 (item)0323-designated area should be assigned for waste collection.jpg

Date: 23/03/2018

Contract: 20150362

Date: 23/03/2018

Contract: KL/2011/01

Observation: Stagnant water should be cleared.

Observation: Designated area should be assigned for waste collection.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\follow-up\KL201203(same weekly)\KL201203 drip tray should be provided for chemical substance.jpg

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 3 Dusty materials should be covered properly..JPG

Date: 23/03/2018

Contract: KL/2012/03

Date: 29/03/2018

Contract: SCL 1109

Observation: Drip tray should be provided for chemical substance.

Observation: Dusty materials should be covered properly.

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 4 Stockpile should be covered properly..JPG

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 5 6527_accumulated waste should be cleaned frequently..jpg

Date: 29/03/2018

Contract: SCL 1123

Date: 29/03/2018

Contract: NKIL 6527

Observation: Stockpile should be covered properly.

Observation: Accumulated waste should be cleaned frequently.

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 6 Black smoke was spotted..JPG

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 7 2477EM stockpiles should be covered properly..JPG

Date: 29/03/2018

Contract: NKIL 6563

Date: 29/03/2018

Contract: SCL 1109

Observation: Black smoke was spotted.

Observation: Dusty materials should be covered properly.

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 8 Stage5 stockpiles should be covered properly.(peako).JPG

 

Date: 29/03/2018

Contract: KL/2015/02

 

 

Observation: Dusty materials should be covered properly.

 


 

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.02\Followup\follow 1.JPG

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.02\Followup\follow2.JPG

Date: 02/03/2018

Contract: UGL near Gate 6

Date: 02/03/2018

Contract: UGL near Gate 6

Observation: Skips should be covered to avoid dust nuisance.

Observation: Accumulated waste should be cleaned regularly.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.02\Followup\follow3 (1).JPG

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\Skips should be properly covered to avoid dust nuisance.jpg

 

Date: 02/03/2018

Contract: UGL near Gate 6

Date: 09/03/2018

Contract: UGL near recycling sites

 

Observation: Accumulated waste should be cleaned regularly.

Observation: Skips should be covered to avoid dust nuisance.

 

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\a Accumulated waste should be cleaned regularly..jpg

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\b Accumulated waste should be cleaned regularly..jpg

 

Date: 09/03/2018

Contract: UGL near Gate 6

Date: 09/03/2018

Contract: UGL near Gate 6

Observation: Accumulated waste should be cleaned regularly.

Observation: Accumulated waste should be cleaned regularly.

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.09\item for KTD\Dust suppression measures should be provided to the haul road..jpg

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.16\item for KTD\follow up photo1.JPG

 

Date: 09/03/2018

Contract: UGL near Gate 6

Date: 16/03/2018

Contract: UGL near recycling sites

 

Observation: Dust suppression measures should be provided for haul road.

Observation: Skips should be covered to avoid dust nuisance.

 

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.16\item for KTD\follow up photo2.JPG

描述: \\castcofile\p\Inspection\Indoor Air Quality\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.16\item for KTD\follow up photo4.JPG

 

Date: 16/03/2018

Contract: UGL near Gate 6

Date: 16/03/2018

Contract: UGL near Gate 6

Observation: Accumulated waste should be cleaned regularly.

Observation: Dust suppression measures should be provided for haul road.

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\follow up photo 1.JPG

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\follow up photo 2.JPG

 

Date: 23/03/2018

Contract: UGL near recycling sites

Date: 23/03/2018

Contract: UGL near Gate 6

 

Observation: Skips should be covered to avoid dust nuisance.

Observation: Accumulated waste should be cleaned regularly.

 

描述: X:\Report\2017\CEDD Kai Tak ET KLN-2016-09\Weekly site inspection\Weekly report\2018.03.23 (joint R1)\item for KTD\resize\follow up photo 3.JPG

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 1 Skips should be properly covered to avoid dust nuisance..JPG

 

Date: 23/03/2018

Contract: UGL near Gate 6

Date: 29/03/2018

Contract: UGL near recycling sites

 

Observation: Accumulated waste should be cleaned regularly.

Observation: Skips should be covered to avoid dust nuisance.

 

描述: C:\Users\mio.mtleong\Desktop\新增資料夾 (2)\Item 2 Accumulated waste should be cleaned regularly..JPG

 

 

Date: 23/03/2018

Contract: UGL near Gate 6

 

 

 

Observation: Accumulated waste should be cleaned regularly.