Table 1.2      Summary Table for Major Site Activities undertaken within KTD in the Reporting Month

 

KDO, CEDD projects

Contract No.

Project Title

Site Activities

KL/2011/01

Kai Tak Development ¡V Reconstruction and Upgrading of Kai Tak Nullah

1)    Construction of Desilting Compound No.2

2)    Construction for Desilting Compound No.1

3)    Construction for box culvert and open channel

4)    TTA at Kai Fuk Road

5)    Settlement monitoring

6)    Drainage diversion works at Kai Tak Nullah

7)    ELS works for box culvert and open channel


 

KL/2012/02

Kai Tak Development ¡V Stage 3A Infrastructure at Former North Apron Area

1)    Site Clearance

2)    RC works for VT1 at Portion G

3)    Drainage works for connection to box culvert (KTOB)

4)    Hard landscaping works for Portion F1

5)    Cross road duct at Choi Hung Road

6)    Road and drainage works at Sze Mei Street and Luk Hop Street

7)    Condition survey and monitoring survey

8)    Earthwork at Portion E3

9)    Footpath construction at Sam Chuk Street and Tsat Po Street

10)ELS works for SW3 at San Po Kong

KL/2012/03

Kai Tak Development ¡V Stage 4 Infrastructure at Former North Apron Area

1)    E&M and finishing works for Pumping Station PS2

2)    Trench excavation and installation of box culvert B6 and outfall

3)    Construction of utilities and roadworks at Road D2

4)    Road widening works at Sung Wong Toi Road

5)    Construction of pits and pipe jacking works at TKW area

6)    Construction of drainage and utilities works at Road L19

7)    E&M and finishing works for Pumping Station NPS

8)    Excavation, lateral support and pipe laying works for DCS

9)    Construction of drainage and utilities works at Road L6

KL/2014/01

Kai Tak Development ¡V Stage 2 Infrastructure Works for Developments at the Southern Part of the Former Runway

1)    Watermain works

2)    Construction of boundary wall at EPD recycling centre

3)    Bored piles and Pre-bored socketed H-piles

4)    TTA implementation at Shing Fung Road and Wang Chiu Road/ Sheung Yee Road

5)    Open excavation for box culvert, piles caps and underpass

6)    ELS installation for box culvert and underpass

KL/2014/03

Kai Tak Development ¡V Stage 3 Infrastructure Works for Developments at the Southern Part of the Former Runway

1)    ELS works for Supporting Underground Structure

2)    Construction of guide wall and D-wall

3)    Construction of Socketed H-piles

4)    Construction of Subway B

5)    Construction of Temporary Utility Diversion

KL/2015/02

Kai Tak Development ¡V Stage 5A Infrastructure at Former North Apron Area

1)    Site Clearance at Portion 1 & 2

2)    Construction of Contractor¡¦s Office at Works Area WA1

3)    Erection of Chain-Link Fence and Hoarding

4)    Excavation of Box Culvert Construction

5)    Site Investigation of Bored Piling Works

6)    Construction of Temporary Road for TTMS

7)    Bored Piling Works

8)    Construction of Box Culvert B3

KL/2015/03

Kai Tak Development ¡V Stage 3B Infrastructure at Former North Apron Area

1)    Condition Survey

 

DSD projects

Contract No.

Project Title

Site Activities

DC/2011/04

Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau

1)    Maintain of the access road, Engineer¡¦s Principal Office and Contractor¡¦s Site Office

 

WSD projects

Contract No.

Project Title

Site Activities

3/WSD/08

Replacement and Rehabilitation of Water Mains Stages 2 & 3

1)    Storage of water works material

6/WSD/08

1)    Construction material storage (Portion 2-3)

7/WSD/08

1)    Site Office of the Contractor

2)    Storage of water works material

3)    Storage and sorting of C&D materials

8/WSD/08

1)    Pipe materials storage (Kai Tak ¡V Portion 1-2)

 

ArchSD projects

Contract No.

Project Title

Site Activities

SS A501

Design and Construction of Centre of Excellence in Paediatrics

1)    Concreting

2)    Formwork and falsework

3)    Bar Bending and Fixing

4)    Dismantling of ELS

5)    Blockwall construction and Plastering

6)    Arising of Tower Crane

7)    Installation of Material Hoists

8)    Installation of Curtain Wall

9)    E&M Installation

10)Linkbridge Installation

SS E517

Construction of a 30-classroom Secondary School at Kai Tak Development, Kowloon (Site 1A-2)

1)    Formation works

2)    Setting Hoarding

SS C503

Design and Construction of Kowloon East Regional Headquarters and Operational Base cum Ngau Tau Kok Divisional Police Station at 105 Concorde Road, Kai Tak

1)    Site Clearance

2)    Barricading the Works Areas along Site Boundary

3)    Preparation works

 

EMSD projects

Contract No.

Project Title

Site Activities

1020EM12A

District Cooling System (DCS) at Kai Tak Development (KTD) Phase III (Package A)-Chilled Water Pipe Laying Works

1)    Excavation

2)    Remove sheet pile

3)    Pile laying & Gate Valve Installation

2477EM14A

District Cooling System (DCS) at Kai Tak Development (KTD) Phase III (Package B)-Water Pipe Laying Works

1)    Pipe laying

2)    ELS

2487EM14W

District Cooling System (DCS) at Kai Tak Development (KTD) Phase III (Package B)-Electrical and Mechanical Installation

1)    E&M installation inside Kai Tak Station

2)    Pipe laying works at EMSD Headquarter

3)    E&M installation inside North DCS Plant

 

HD projects

Contract No.

Project Title

Site Activities

HY/2014/18

Provision of Barrier-Free Access Facilities for Highway Structures ¡V Phase 3 Contract 7

1)    Hoarding Setting

2)    Formwork construction

 

MTR projects

Contract No.

Project Title

Site Activities

1107

Diamond Hill to Kai Tak Tunnels

1)    Backfilling works at cut and cover tunnels

2)    Reinstatement and backfilling works of drainage

1108

Kai Tak Station and Associated Tunnels

1)    Open cut tunnel: DT and UT general cleaning and defect rectification, materials clearance at UT stitch joint in progress

2)    Cut and cover tunnel: DT and UT general cleaning and defect rectification, access shaft pre-cast concrete slab construction in progress

3)    Station: Drainage work at all area, leveling to F.F.L. in Area 3, installation of roof cladding at Entrance A, B & D, Installation of 5W at all area, rectification for plumbing works, installation of glazed wall at Entrance A, B & D, modification works at existing manhole SM04 and application of cementitious fireproofing at steel roof of Entrance A

1109

Shatin to Central Link: Ma Tau Wai and To Kwa Wan Stations and Tunnels

1)    Proof-drilling

2)    Bulk excavation

3)    Traffic diversion

4)    Strut installation

5)    Sheet piling

1123

Exhibition Station and Western Approach Tunnel

1)    General site clearance

2)    Spoil Disposal

 

HKHA projects

Contract No.

Project Title

Site Activities

20150362

Construction of Home Ownership Scheme at Kai Tak Site 1G1(B)

1)    Formwork erection

2)    Rebar fixing

3)    Concreting

4)    Façade installation

5)    Formwork dismantling

 

COHL projects

Contract No.

Project Title

Site Activities

New Kowloon Inland Lot No. 6516 & 6517

New Kowloon Inland Lot No. 6516 & 6517 - Proposed Residential Development

1)    Lifting operation

2)    Gas welding and flame cutting

3)    Formwork and false work

4)    Steel bar fixing

5)    Concreting

6)    Erection of bamboo scaffold

7)    Cement rendering

8)    Bricklaying

9)    Dismantling of bamboo scaffold

10)Installation of curtain wall

 

K&K Property projects

Contract No.

Project Title

Site Activities

New Kowloon Inland Lot No. 6525

New Kowloon Inland Lot No. 6525 - Residential Development at Kai Tak Area 1I Site 1

1)    Dismantling of ELS at Basement

2)    Steel fixing for 3/F to 6/F of T1, T2 & T3

3)    Erection of Alum. formwork for 3/F to 6/F of T1, T2 & T3

4)    Concrete casting for 3/F of T1, T2 & T3

5)    Setting up of electricity system

6)    E&M works for T1, T2 & T3

7)    Erection of Bamboo scaffold for T1, T2, T3, B2 & B3

8)    Steel fixing for 2/F to 3/F of B2 & B3

9)    Erection of formwork for 2/F to 3/F of B2 & B3

10)Concrete casting for 2/F to 3/F of B2 & B3

 

KWIH projects

Contract No.

Project Title

Site Activities

New Kowloon Inland Lot No. 6526

New Kowloon Inland Lot No. 6526 - Residential Development at Kai Tak Area 1I Site 2

1)    Timber Formwork

2)    Re-bar fixing

3)    Concreting

4)    Levelling

5)    Concrete breaking

6)    Bamboo Scaffolding

7)    Aluminium Formwork

8)    Façade installing

9)    Dry Wall Installing

10)Fitting Out

 

Poly Property projects

Contract No.

Project Title

Site Activities

New Kowloon Inland Lot No. 6527

New Kowloon Inland Lot No. 6527 - Residential Development at Kai Tak Area 1I Site 3

1)    From Basement to Fifth Floor construction

 

Wheelock Properties projects

Contract No.

Project Title

Site Activities

New Kowloon Inland Lot No. 6541

New Kowloon Inland Lot No. 6541 - Residential Development at Kai Tak Area 1H Site 3

1)    Rebar fixing for G/F and 1/F slab and transfer plate

2)    Formwork erection for G/F to 1/F slab, wall and column

3)    Concreting of G/F and 1/F slab, wall, column

4)    E&M concealed conduits fixing

5)    Floor drain installation

 

List of Temporary Government Land Allocations (TGLAs)

Item No.

Allocation No.

Name of Occupants

Site Activities

T1

GLA-TNK 1671 (Site 1)

Civil Engineering & Development Department

Works Area for Stage 1 Infrastructure Works for Public Housing Sites and Government Offices

GLA-TNK 2031 (Site 4)

Civil Engineering & Development Department

Works Area for Stage 3A Infrastructure at North Apron Area

T2

GLA-TRD 65 (2 sites)

RDO of Highways Department

Works Area in connection with SCL

T3

GLA-TNK 1571

Architectural Services Department

Temporary Works Area (Kai Tak Government Offices)

T4

GLA-TRD 115

RDO of Highways Department

Works Area for Temporary Storage of Precast Segments and Construction Material

T5

GLA-TNK 2031 (Site 3)

Civil Engineering & Development Department

Works Area for Stage 3A Infrastructure at North Apron Area

 

GLA-TRD 72 (4 sites)

RDO of Highways Department

Works Area in connection with SCL

T6

GLA-TNK 1850 (Site 1)

PM(K), Civil Engineering & Development Department

Works Area for Stage 2 Infrastructure at North Apron Area

T7

GLA-TNK 2031 (Site 2)

Civil Engineering & Development Department

Works Area for Stage 3A Infrastructure at North Apron Area

T8

GLA-TNK 1801

Housing Department

Works and storage area (Site 1B3)

T9

GLA-TNK 1862

Drainage Services Department

Works Area ¡V Reconstruction & Improvement of Kai Tak Nullah (Choi Hung Road Section)

T10

GLA-TNK 2031 (Site 1)

Civil Engineering & Development Department

Works Area for Stage 3A Infrastructure at North Apron Area

T11

GLA-TNK 1288

Drainage Services Department

Sewage Pumping Station (Kai Tak No.1 DWFI)

T12

GLA-TRD 109

RDO of Highways Department

Works Area in connection with SCL

T13

GLA-TNK 1850 (Site 3)

PM(K), Civil Engineering & Development Department

Works Area for Stage 2 Infrastructure at North Apron Area

 

GLA-TNK 2031 (Site 5)

Civil Engineering & Development Department

Works Area for Stage 3A Infrastructure at North Apron Area

T14

GLA-TNK 2057

PM(K), Civil Engineering & Development Department

Works Area for Stage 4 Infrastructure at North Apron Area

T15

GLA-TNK 1966

PM(K), Civil Engineering & Development Department

Works Area for Kai Tak Nullah Modification Works under Contract No. KL/2011/01

T16

GLA-TNK 1997

Drainage Services Department

Site Office and Storage Area ¡V Reconstruction & Improvement of Kai Tak Nullah (Choi Hung Road Section)

T17

GLA-TNK 2095

PM(K), Civil Engineering & Development Department

Works Area for Stockpiling Area in connection with Kai Tak Nullah Modification Works under Contract No. KL/2011/01

T18

GLA-TNK 2044 (2 sites)

Water Supplies Department

Works Area for Replacement and Rehabilitation of Water Mains Stage 3 Mains in Kowloon - Investigation Design and Construction

T19

GLA-TRD 51

RDO of Highways Department

Tree Nursery at Sung Wong Toi area in connection with SCL

T20

GLA-TRD 104

RDO of Highways Department

Works Area for Temporary Storage of Excavated and Construction Material at Sung Wong Toi Area in connection with SCL

T21

GLA-TNK 2018

HK Police Force

Demolition of Existing Structure

T22

GLA-TRD 108

RDO of Highways Department

Works Area in connection with SCL

T23

GLA-TNK 2031 (Site 6)

Civil Engineering & Development Department

Works Area for Stage 3A Infrastructure at North Apron Area

T24

GLA-TNK 1759

Civil Engineering & Development Department

Works Area (Ttrunk Road T2 Project)

T25

GLA-TNK 1823 (2 sites)

PM(K), Civil Engineering & Development Department

Works Area for Kai Tai Approach Channel ann Kwun Tong Typhoon Shelter

T26

GLA-TNK 1692

Drainage Supplies Department

Works Area (Control of Water Pollution at Jordan Valley Box Culvert)

T27

GLA-TNK 1675

PM(K), Civil Engineering & Development Department

Works Area in connection with Stage 1 Advance Infrastructure Works at Southern Part of Former Runway

T28

GLA-TNK 1977 (2 sites)

Electrical and Mechanical Services Department

Works Area for DCS Phase III (Package A) Works

 

GLA-TNK 2104

Architectural Services Department

Erection of Hoarding

T29

GLA-TNK 1934

CPM 202, Architectural Services Department

Works Area for Establishment of Centre of Excellence in Paediatrics

T30

GLA-TNK 2158

CE/PW, Civil Engineering and Development Department

Works Area for Maintenance of Piers for Contract No. CV/2013/07

T31

GLA-TNK 2037

Highways Department

Maintenance Depot

T32

GLA-TRD 36 (3 sites)

RDO of Highways Department

Works Area for barging facilities in connection with SCL

 

GLA-TRD 085

RDO of Highways Department

Works Area for delivery of tunnel boring machine in connection with SCL

T33

GLA-TNK 1717

Electrical and Mechanical Services Department

Works Area for DCS

T34

GLA-TNK 2061

Civil Engineering & Development Department

Barging Point for Government Projects

T35

GLA-TNK 1707

Civil Engineering & Development Department

Works Area for Site Formation Works for Cruise Terminal

T36

GLA-TNK 1191

Hong Kong Observatory

Automatic Weather Station

T37

GLA-TNK 1693

Architectural Services Department

Works Area for Cruise Terminal Building

T38

GLA-TNK 1542

Hong Kong Observatory

Weather Station

 


List of Short Term Tenancy (STT)

Item No.

STT No.

Name of Occupants

Site Activities

S1

KX2688

Goldway Parking Ltd.

Car-park

S2

KX2915

Goldway Parking Ltd.

Car-park

S3

KX2940

Goldway Parking Ltd.

Car-park

S4

KX2939

Goldway Parking Ltd.

Car-park

S5

SCL001

MTRC

Works area in connection with SCL

S6

KX2261

Hong Kong Aviation Club Ltd.

Training for air traffic controllers

S7

KX2881

Graceful Ocean Development Ltd.

Car-park

S8

KX2882

Skye Parking Ltd.

Car-park

S9

KX2574

Future Chinese Limited

Car-park

S10

KX2575

Nanjing Limited

Car-park

S11

KX2877

CLP Power Hong Kong Limited

Constructing, maintaining and operating the Underground  Cable Tunnel

S12

KX2675

Wang Lee Building Materials Trading Ltd.

Operation of business in the recovery and recycling

S13

KX2676

Ga Shing Transport Co.

Operation of business in the recovery and recycling

S14

KX2677

Chuen Kee Metal Trading Co Ltd.

Operation of business in the recovery and recycling

S15

KX2678

Kin Xun Environment Recycle Ltd

Operation of business in the recovery and recycling

S16

KX2935

Architectural Services Department

Works area and /or storage area in connection with construction of Centre of Excellence in Paediatrics

S17

KX2641

Citybus Limited

Parking of buses

S18

KX2569

Sureguard Logistics Limited

Open storage of goods and dangerous goods

S19

KX2616

CLP Power Hong Kong Limited

Constructing, maintaining and operating Underground  Strata I and II and The Pink Edged Red Area