Table 7.1 Summary Table for
Site Activities undertaken within KTD for Coming Two Month
KDO, CEDD projects
Contract No. |
Project Title |
Site Activities |
March and April 2013 |
||
KL/2009/01 |
Site Formation for Kai Tak Cruise Terminal |
1) Dredging of Marine Sediment 2) Installation of temporary steel bracing 3) Sorting of C&D material from existing seawall 4) RC Desk Construction 5) Reconstruction of Seawall 6) Impact water monitoring / surveillance system 7) Erection and maintenance of silt curtain 8) Construction of capping beam 9) Removal of existing seawall |
KL/2008/09 |
Stage 1 Infrastructure works at North Apron |
1) Road Works 2) Cladding Installation at Footbridge 3) Soft Landscaping works 4) Paving works at footpath 5) Subway Enhancement works |
KL/2008/07 |
Stage 1 Advance Infrastructure Works |
1) Bamboo planting along Road TD3 and TL14 2) Rectification Works |
KL/2010/02 |
Kai Tak
Development ¨C Kai Tak Approach Channel and Kwun Tong Typhoon Shelter Improvement Works (Phase 1) |
1) Full scale Bioremediation 2) Embankment improvement works 3) Water quality monitoring for bioremediation |
KL/2010/03 |
Kai Tak Development Stage 2 Infrastructure
Works at North Apron Area |
1) Site Clearance 2) Formation works 3) Road Drainage Construction 4) Box Culvert Construction 5) Sewage Pumping Station Construction |
KL/2011/01 |
Kai Tak Development
¨CReconstruction and Upgrading of Kai Tak Nullah |
1) Site clearance 2) Erection of hoarding 3) Erection
of the Engineer¡¯s site office 4) Ground Investigation |
DSD project
Contract
No. |
Project Title |
Site Activities |
March and April
2013 |
||
DC/2008/12 |
Sewage Interception Scheme in Kowloon City |
1) Construction of boundary wall 2) Landscape works for pumping stations 3) E&M works for pumping stations 4) Architectural finishing works for pumping
stations |
DC/2010/03 |
Kai Tak Nullah Improvement Works at Prince Edward Road East |
1) Maintain Engineer's Principal Office 2) Maintain Contractor's Site Office and Site Compound 3) Stockpile excavated C&D waste material of Prince Edward Road East |
DC/2009/21 |
Provision of
Interception Facilities at Jordan Valley Box Culvert |
1) Steel fixing 2) Formworks 3) Concreting 4) Excavation 5) Drainage works |
DC/2011/04 |
Reconstruction, Improvement and
Rehabilitation of Kai Tak River from Wong Tai Sin
Police Station to Tung Tau |
1) Maintain of the access road, Engineer¡¯s Principal Office and
Contractor¡¯s Site Office |
HD projects
Contract
No. |
Project Title |
Site Activities |
March and April
2013 |
||
20090097 |
Public Rental Housing Development at Kai Tak Site 1A |
1)
Architectural Works |
20090006 |
Public Rental Housing Development at Kai Tak Site 1B |
1) Construction of
Substructure works 2) Construction of
Superstructure works |
WSD project
Contract
No. |
Project Title |
Site Activities |
March and April
2013 |
||
3/WSD/08 |
Replacement and Rehabilitation of Water Mains Stages 2 & 3 |
1) Site Office of
the Contractor 2) Storage of water
works material 3) Storage and
sorting of C&D materials |
6/WSD/08 |
1) Construction
material storage (Portion G2) 2) C&D material
storage (Portion G4) |
|
7/WSD/08 |
1) Transportation
and storage of pipe works material (Portion BX1) 2) Transportation
and sorting of construction waste (Portion BX1) 3) Fabrication of
special pipe fittings (Portion B1) |
|
8/WSD/08 |
1) C&D materials
storage (Portion T1) 2) Pipe materials
storage (Portion T2) |
ArchSD project
Contract No. |
Project Title |
Site Activities |
March and April
2013 |
||
SS W
303 |
Kai Tak Cruise
Terminal Building and Ancillary Facilities |
1) Staircase construction 2) BS Installation inside Main Box Beam 3) Façade Installation 4) Feature Roof Installation 5) Construction
of tile, ceiling, block wall, stud wall partition, smoke barrier, plastering, painting, waterproofing 6) Installation
of bookroom door, smoke curtain, water barrier,
fire barrier, horizontal lifeline system, roller shutter, sanitary fittings,
stainless steel door |
SS W 304 |
Design and
Construction of Trade and Industry Tower in Kai Tak
Development Area |
1) Excavation and Lateral Support 2) Pre-boring 3) Dewatering 4) Steel piling |
SS A 504 |
Runway Park at Kai Tak, Kowloon City
District - Phase 1 |
1) Site Surveying and setting out 2) General excavation 3) Drainage construction 4) Construction of Temp. Ancillary Block 5) Construction of
Balustrade along Seawall 6) Construction of Transformer Room 7) Construction of Temporary Auto Irrigation Plan Room 8) Construction of Cable Draw Pits 9) Disposal of C&D Waste 10)Structural steel works & plaster work |
CLP projects
Contract
No. |
Project Title |
Site Activities |
March and April
2013 |
||
|
Kai Tak Cruise Terminal Cable Tunnel |
No civil activity |
Eastern Road
Substation |
||
CKL-KCT circuit 1&2 |
CLPP (132kV
cable installation) |
11kV & LV cable laying and jointing |
EMSD projects
Contract
No. |
Project Title |
Site Activities |
March and April
2013 |
||
1016EM10 |
Chilled Water
Pipe Laying Works at North Apron Area for District Cooling System at Kai Tak Development |
1) Backfilling 2) Reinstatement |
1017EM10 |
Design-Build-Operate
a District Cooling System (Phase II Works) at Kai Tak
Development |
1) Dewatering works at SDCS Plant and SWPR 2) E&M Installation for Cooling Plants and T&C 3) ELS works and pipe installation of Outfall 4) ELS for Outfall and Seawater Intake Culvert 5) ELS for DCS Pipes and Pipe Laying at Road L4 6) Basement and temporary plant set up at SDCS
& SWPR 7) RC structures (formwork, steel reinforcement and concreting) 8) Superstructure and external works at NDCS 9) Operation of temporary District Cooling
Plant at SDCS 10)Construction
of seawater intake culvert at existing seawall portion |
1049EM10 |
Kai Tak Cruise Terminal Development ¨C On-shore Sewage
Collection, On-shore Fresh Water Supply, and Fire Hydrant Water Supply
Systems |
1) Testing of pipes inside Cruise Terminal Blg 2) Installation of pipe on Arpon area |
1050EM10 |
Design
and Build of Seaport Passenger Boarding Bridges for the Kai Tak Cruise Terminal |
1) Installation of power busbar 2) Installation of rail in Apron Deck Berth I |
1140EM11M |
Advance
Works for the Apron Lighting System of the Kai Tak
Cruise Terminal |
1) Cable trunking installation at GL7-GL9 2) Cabling at GL2-GL9 3) Cable conduit installation at GL2-GL8 4) Flood light bracket installation at GL8-GL72 |
1048EM12M |
Supply and Installation of Apron Low Voltage Power Supply Systems for the Kai Tak Cruise Terminal |
1) Cable tray installation at switch room ¡®A¡¯ & ¡®B¡¯ 2) Cable connection for L.V. switchboards ¡®A¡¯ & ¡®B¡¯ 3) Weatherproof socket outlet installation at Berth 1 4) Guard house installation |
1119EM12M |
Apron Lighting
System for Kai Tak Cruise Terminal |
Install the
Apron lights |
MTR projects
Contract
No. |
Project Title |
Site Activities |
March and April
2013 |
||
1108A |
Kai Tak Barging Point Facilities |
1) Spoil Disposal 2) Installation of conveyor belts |
1109 |
Shatin to Central Link: Ma Tau Wai and To Kwa Wan Stations and
Tunnels |
1) Site Hoarding and Project Signboard
Erection 2) GI and pre-drilling works 3) Utilities Diversion 4) Sheet Piling 5) TBM Launching Shaft Construction |
URA project
Contract
No. |
Project Title |
Site Activities |
March and April
2013 |
||
New Kowloon Inland Lot No. 6515 |
Kai Tak Flat-For-Flat Development |
1) Hoarding Installation for the remaining site boundary 2) Loading Test |