Table 7.1    Summary Table for Site Activities undertaken within KTD for Coming Two Month

 

KDO, CEDD projects

Contract No.

Project Title

Site Activities

March and April 2013

KL/2009/01

Site Formation for Kai Tak Cruise Terminal

1)    Dredging of Marine Sediment

2)    Installation of temporary steel bracing

3)    Sorting of C&D material from existing seawall

4)    RC Desk Construction

5)    Reconstruction of Seawall

6)    Impact water monitoring / surveillance system

7)    Erection and maintenance of silt curtain

8)    Construction of capping beam

9)    Removal of existing seawall

KL/2008/09

Stage 1 Infrastructure works at North Apron

1)    Road Works

2)    Cladding Installation at Footbridge

3)    Soft Landscaping works

4)    Paving works at footpath

5)    Subway Enhancement works

KL/2008/07

Stage 1 Advance Infrastructure Works

1)    Bamboo planting along Road TD3 and TL14

2)    Rectification Works

KL/2010/02

Kai Tak Development ¨C Kai Tak Approach Channel and Kwun Tong Typhoon Shelter Improvement Works (Phase 1)

1)    Full scale Bioremediation

2)    Embankment improvement works

3)    Water quality monitoring for bioremediation

KL/2010/03

Kai Tak Development Stage 2 Infrastructure Works at North Apron Area

1)    Site Clearance

2)    Formation works

3)    Road Drainage Construction

4)    Box Culvert Construction

5)    Sewage Pumping Station Construction    

KL/2011/01

Kai Tak Development ¨CReconstruction and Upgrading of Kai Tak Nullah

1)    Site clearance

2)    Erection of hoarding

3)    Erection of the Engineer¡¯s site office

4)    Ground Investigation

 

DSD project

Contract No.

Project Title

Site Activities

March and April 2013

DC/2008/12

Sewage Interception Scheme in Kowloon City

1)    Construction of boundary wall

2)    Landscape works for pumping stations

3)    E&M works for pumping stations

4)    Architectural finishing works for pumping stations

DC/2010/03

 

Kai Tak Nullah Improvement Works at Prince Edward Road East

1)    Maintain Engineer's Principal Office

2)    Maintain Contractor's Site Office and Site Compound

3)    Stockpile excavated C&D waste material of Prince Edward Road East

DC/2009/21

Provision of Interception Facilities at Jordan Valley Box Culvert

1)    Steel fixing

2)    Formworks

3)    Concreting

4)    Excavation

5)    Drainage works

DC/2011/04

Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong Tai Sin Police Station to Tung Tau

1)    Maintain of the access road, Engineer¡¯s Principal Office and Contractor¡¯s Site Office

 

HD projects

Contract No.

Project Title

Site Activities

March and April 2013

20090097

Public Rental Housing Development at Kai Tak Site 1A

1)    Architectural Works

20090006

Public Rental Housing Development at Kai Tak Site 1B

1)  Construction of Substructure works

2)  Construction of Superstructure works

 

WSD project

Contract No.

Project Title

Site Activities

March and April 2013

3/WSD/08

Replacement and Rehabilitation of Water Mains Stages 2 & 3

1)    Site Office of the Contractor

2)    Storage of water works material

3)    Storage and sorting of C&D materials

6/WSD/08

1)    Construction material storage (Portion G2)

2)    C&D material storage (Portion G4)

7/WSD/08

1)    Transportation and storage of pipe works material (Portion BX1)

2)    Transportation and sorting of construction waste (Portion BX1)

3)    Fabrication of special pipe fittings (Portion B1)

8/WSD/08

1)    C&D materials storage (Portion T1)

2)    Pipe materials storage (Portion T2)

 

ArchSD project

Contract No.

Project Title

Site Activities

March and April 2013

SS W 303

Kai Tak Cruise Terminal Building and Ancillary Facilities

1)    Staircase construction

2)    BS Installation inside Main Box Beam

3)    Façade Installation

4)    Feature Roof Installation

5)    Construction of tile, ceiling, block wall, stud wall partition, smoke barrier, plastering, painting, waterproofing

6)    Installation of bookroom door, smoke curtain, water barrier, fire barrier, horizontal lifeline system, roller shutter, sanitary fittings, stainless steel door

SS W 304

Design and Construction of Trade and Industry Tower in Kai Tak Development Area

1)    Excavation and Lateral Support

2)    Pre-boring

3)    Dewatering

4)    Steel piling

SS A 504

Runway Park at Kai Tak, Kowloon City District - Phase 1

1)    Site Surveying and setting out

2)    General excavation

3)    Drainage construction

4)    Construction of Temp. Ancillary Block

5)    Construction of Balustrade along Seawall

6)    Construction of Transformer Room

7)    Construction of Temporary Auto Irrigation Plan Room

8)    Construction of Cable Draw Pits

9)    Disposal of C&D Waste

10)Structural steel works & plaster work

 

CLP projects

Contract No.

Project Title

Site Activities

March and April 2013

 

Kai Tak Cruise Terminal Cable Tunnel

No civil activity

Eastern Road Substation

CKL-KCT circuit 1&2

CLPP (132kV cable installation)

11kV & LV cable laying and jointing

 

EMSD projects

Contract No.

Project Title

Site Activities

March and April 2013

1016EM10

Chilled Water Pipe Laying Works at North Apron Area for District Cooling System at Kai Tak Development

1)    Backfilling

2)    Reinstatement

 

1017EM10

Design-Build-Operate a District Cooling System (Phase II Works) at Kai Tak Development

1)    Dewatering works at SDCS Plant and SWPR

2)    E&M Installation for Cooling Plants and T&C

3)    ELS works and pipe installation of Outfall

4)    ELS for Outfall and Seawater Intake Culvert

5)    ELS for DCS Pipes and Pipe Laying at Road L4

6)    Basement and temporary plant set up at SDCS & SWPR

7)    RC structures (formwork, steel reinforcement and concreting)

8)    Superstructure and external works at NDCS

9)    Operation of temporary District Cooling Plant at SDCS

10)Construction of seawater intake culvert at existing seawall portion

1049EM10

Kai Tak Cruise Terminal Development ¨C On-shore Sewage Collection, On-shore Fresh Water Supply, and Fire Hydrant Water Supply Systems

 

1)    Testing of pipes inside Cruise Terminal Blg

2)    Installation of pipe on Arpon area

 

1050EM10

Design and Build of Seaport Passenger Boarding Bridges for the Kai Tak Cruise Terminal

1)    Installation of power busbar

2)    Installation of rail in Apron Deck Berth I

 

1140EM11M

Advance Works for the Apron Lighting System of the Kai Tak Cruise Terminal

1)    Cable trunking installation at GL7-GL9

2)    Cabling at GL2-GL9

3)    Cable conduit installation at GL2-GL8

4)    Flood light bracket installation at GL8-GL72

 

1048EM12M

Supply and Installation of Apron Low Voltage Power Supply Systems for the Kai Tak Cruise Terminal

1)    Cable tray installation at switch room ¡®A¡¯ & ¡®B¡¯

2)    Cable connection for L.V. switchboards ¡®A¡¯ & ¡®B¡¯   

3)    Weatherproof socket outlet installation at Berth 1

4)    Guard house installation

1119EM12M

Apron Lighting System for Kai Tak Cruise Terminal

Install the Apron lights

 

MTR projects

Contract No.

Project Title

Site Activities

March and April 2013

1108A

Kai Tak Barging Point Facilities

1)    Spoil Disposal

2)    Installation of conveyor belts

1109

Shatin to Central Link: Ma Tau Wai and To Kwa Wan Stations and Tunnels

1)    Site Hoarding and Project Signboard Erection

2)    GI and pre-drilling works

3)    Utilities Diversion

4)    Sheet Piling

5)    TBM Launching Shaft Construction

 

URA project

Contract No.

Project Title

Site Activities

March and April 2013

New Kowloon Inland Lot No. 6515

Kai Tak Flat-For-Flat Development

1)    Hoarding Installation for the remaining site boundary

2)    Loading Test