The Kai Tak Development (KTD) is located in the south-eastern part
of Kowloon Peninsula, comprising the apron and runway areas of the former Kai Tak Airport and existing waterfront areas at To Kwa Wan, Ma Tau Kok, Kowloon Bay,
Kwun Tong and Cha Kwo Ling.
It covers a land area of about 328 hectares. The Project also covers Kowloon
Bay and Kwun Tong Typhoon Shelter and the adjacent
water bodies. The general layout of the Project is shown in Figure 1.
1.2
Civil
Engineering and Development Department (CEDD) had completed an Environmental
Impact Assessment (EIA) study for KTD under Agreement No. CE 35/2006(CE) Kai Tak Development Engineering Study cum Design and
Construction of Advance Works ¡V Investigation, Design and Construction
(hereafter called ¡§Schedule 3 EIA Report¡¨). The Schedule 3 EIA Report was
approved under Environmental Impact Assessment Ordinance (EIAO) in March 2009.
1.3
As
recommended in the Schedule 3 EIA Report, EM&A programme shall be required
for different phases of the KTD as a whole. In August 2010, Cinotech
Consultants Limited was commissioned by CEDD to undertake the Environmental Monitoring and Audit
(EM&A) works for KTD. Under the Contract, Environmental Team (ET(KTD)) shall oversee all the environmental issues within
the Kai Tak Development (KTD), including but not
limit to the Schedule 2 Designated Projects and other work contracts.
1.4
Cinotech
Consultants Limited was commissioned by CEDD to
undertake the Environmental Monitoring and Audit (EM&A) works for KTD. This is the 4th Monthly EM&A report
summarizing the EM&A works for the Project in April 2011.
1.5
Different
parties with different levels of involvement in the project organization
include:
¡P
Environmental
Protection Department (The Authority);
¡P
Project Proponent ¡V Civil Engineering and
Development Department (CEDD).
¡P
The Engineer and the Engineer¡¦s Representative (ER) ¡V AECOM.
¡P
Environmental Team (ET(KTD)) ¡V Cinotech Consultants Limited (CCL).
¡P
Independent Environmental Checker (IEC(KTD)) ¡V Allied Environmental Consultants Limited (AEC).
1.6
The key
contacts of the Project are shown in Table 1.1.
Table 1.1 Key Project Contacts
|
Role |
Contact Person |
Phone No. |
Fax No. |
|
|
CEDD |
Project Proponent |
Mr. K Y SHIN |
2301 1461 |
2301 1277 |
|
Mr. William WONG |
3104 2197 |
2301 1277 |
||
|
AECOM |
Engineer¡¦s
Representative |
Ms. Anna CHUNG |
3105 8516 |
2891 0305 |
|
Cinotech |
Environmental Team (KTD) |
Dr. Priscilla Choy |
2151 2089 |
3107 1388 |
|
Ms.
Ivy Tam |
2151
2090 |
|||
|
AEC |
Independent Environmental Checker (KTD) |
Ms. Grace
Kwok |
2815 7028 |
2815 5399 |
1.7
There are several
works contracts undertaken within KTD during the reporting month. In
order to collect relevant environmental information from the work contracts and
incorporate into this monthly monitoring report, a survey form for monthly
environmental performance records was sent to all work contracts/tenants within KTD on 30 November 2010. The survey form shall be
returned by 5th each month to provide the environmental monthly information of
respective work contracts within KTD.
1.8
Based on the
returned survey form from work contracts and site
observation for short term tenancy
(STT) / temporary government land allocation (TGLA) during the weekly site inspection, the major site activities undertaken within Kai Tak Development (KTD) in the reporting month are summarized in Table 1.2:
Table 1.2 Summary Table for Major Site Activities undertaken within KTD in the Reporting month
KDO, CEDD projects
|
Contract No. |
Project Title |
Site Activities |
|
KL/2009/01 |
Site
Formation for Kai Tak Cruise Terminal |
1) Piling Works 2) Installation of precast frontal panels 3) Dredging Works 4) Installation of temporary steel bracing 5) Sorting of C&D material from existing seawall 6) Erection and maintenance of silt curtain 7) Impact water quality monitoring/surveillance
system |
|
KL/2008/09 |
Stage
1 Infrastructure works at North Apron |
1) Drainage Works 2) Watermain Works 3) Footbridge Superstructure construction 4) Construction of subway extension 5) Road Works |
|
KL/2008/07 |
Stage
1 Advance Infrastructure Works |
1) Construction of sewage pumping station 2) Laying of drainage, sewerage and waterworks
at Road TD3 3) Waterworks at Road TL14 4) Watermain laying at Hoi Bun Road 5) Junction improvement works at Wang Chiu Road 6) Filling for public landing steps cum
fireboat berth 7) Pipe jacking of watermain
across Wang Chiu Road 8) Construction of superstructure of the sewage
pumping station |
|
KL/2009/02 |
Site
Investigation for Trunk Road T2 and Infrastructure at South Apron (Stage 1) |
1)
Instrument
monitoring |
CEO, CEDD project
|
Contract No. |
Project Title |
Site Activities |
|
CV/2007/03 |
Development
at Anderson Road |
Disposal of inert C&D material at Kai Tak |
DSD project
|
Contract No. |
Project Title |
Site Activities |
|
DC/2008/12 |
Sewage Interception Scheme in Kowloon
City |
1) Construction of substructure of pumping stations 2) Laying of twin rising mains by open trench method 3) Construction of chambers, manholes etc. 4) Backfilling of trenches for rising mains 5) Laying of gravity sewers in To Kwa Wan Road 6) Waterproofing & backfilling works for pumping stations 7) Construction of superstructure of pumping
stations |
|
DC/2010/03 |
Kai Tak
Nullah Improvement Works at Prince Edward Road East |
1) Maintain Engineer¡¦s Principal Office 2) Maintain Contractor¡¦s Site Office and Site Compound 3) Construction of Box Culvert bay 1A-a |
|
DC/2009/21 |
Provision
of Interception Facilities at Jordan Valley Box Culvert |
1) Sheet Piling for Impermeable Wall 2) Bored Piling 3)
Excavation 4)
Tree
Transplantation |
|
Contract No. |
Project Title |
Site Activities |
|
20090097 |
Public Rental Housing
Development at Kai Tak Site 1A |
1)
Construction of Superstructure
(6 blocks) 2)
External Works |
|
20090006 |
Public Rental Housing
Development at Kai Tak Site 1B |
1) Construction of Substructure works 2) Construction of Superstructure works 3) Construct of VPB Study Mock-up 4) Construction of Precast Water Tank |
WSD project
|
Contract No. |
Project Title |
Site Activities |
|
16/WSD/06 |
Replacement and Rehabilitation
of Water Mains Stages 2 & 3 |
Handover the Area back to LandsD on 1 April
2011 |
|
26/WSD/06 |
||
|
3/WSD/08 |
1) Site Office of the Contractor 2) Storage of water works material 3) Storage and sorting of C&D materials |
|
|
6/WSD/08 |
1) Construction material storage (Portion DX1) 2) C&D material storage (Portion D1) |
|
|
7/WSD/08 |
1) Transportation and storage of pipe works material (Portion BX1) 2) Transportation and sorting of construction waste (Portion BX1) 3) Fabrication of special pipe fittings (Portion B1) |
|
|
8/WSD/08 |
1) C&D materials storage (Portion E1) 2) Pipe materials storage (Portion E2) |
ArchSD
project
|
Contract No. |
Project Title |
Site Activities |
|
SS W 303 |
Kai Tak
Cruise Terminal Building and Ancillary Facilities |
1) Construction pile caps 2) Driven H-pile works 3) Mobilization and set up concrete pre-cast
yard at Area B & C 4) Tree nursery 5) ELS, excavation and pile caps 6) Tower crane foundation construction |
|
TCT323 |
Ground
Investigation works for ¡§Establishment for Centre of Excellence in Paediatrics¡¨ |
1)
Ground Investigation Works |
CLP projects
|
Contract No. |
Project Title |
Site Activities |
|
|
Kai Tak Cruise Terminal Cable Tunnel |
No civil activity |
|
Eastern Road Substation |
No civil activity |
|
|
CKL-KCT circuit
1&2 |
CLPP (132kV cable installation) |
132kV cable trenching |
EMSD projects
|
Contract No. |
Project Title |
Site Activities |
|
1016EM10 |
Chilled Water Pipe Laying Works at North Apron Area for District
Cooling System at Kai Tak Development |
Trail Pit Excavation |
|
1017EM10 |
Design-Build-Operate a District Cooling System (Phase II Works) at Kai Tak Development |
1) Construction of Site Offices 2) Hoarding Erection 3) Ground Investigation Works 4) Trial Trenches Excavation 5) Preliminary Works for Site Set-up 6)
Predrilling Works |
List
of Temporary Government Land Allocations (TGLAs)
|
TGLA No. |
Name of Occupants |
Site Activities |
|
GLA-TNK 1591 |
CE/LW, Civil Engineering & Development
Department |
Works area for maintenance of
equipments and storage |
|
GLA-TNK 1578 |
CEO, Civil Engineering & Development
Department |
Depot area |
|
GLA-TNK 1456 |
CGE/LPM3, Civil Engineering and Development
Department |
Works area for maintenance of equipments
and storage |
|
GLA-TNK 1525 |
Civil Engineering & Development
Department |
Engineer¡¦s Office and
Contractor¡¦s Depot |
|
GLA-TNK 1580 |
PM(K), Civil Engineering & Development
Department |
Works area for maintenance of equipments and storage |
|
GLA-TNK 1646 |
GEO, Civil Engineering and Development
Department |
Stockpiling of excavated and construction
materials |
|
GLA-TNK 1581 |
PM(K), Civil Engineering & Development
Department |
Housekeeping of Ex GFS
Building |
|
GLA-TNK 1144 |
CE/PW, Civil Engineering and Development
Department |
Works Area for the Maintenance
Term Contract for Piers and other Port Works |
|
GLA-TNK 1226 |
CE/PW, Civil Engineering and Development
Department |
|
|
GLA-TNK 1636 |
Drainage Services Department |
Works completed |
|
GLA-TNK 1560 |
Slope Maintenance Section, Lands Department |
Depot area |
|
GLA-TNK 1177 |
Electrical and Mechanical Services
Department |
Vehicle maintenance depot |
|
GLA-TNK 1338 |
Highways Department |
Contractor¡¦s Maintenance Depot |
|
GLA-TNK 1713 |
Highways Department |
Storage |
|
GLA-TNK 1709 |
Water Supplies Department |
Works area for maintenance of equipments and storage |
|
GLA-TNK 1608 |
Transport Department |
1) Electronic equipment and system testing 2)
Storage of equipment |
|
GLA-TNK 1760 |
Drainage Services Department |
Site office and storage area |
|
GLA-TNK 1568 |
Fire Services Department |
Driving training ground |
|
GLA-TNK 1360 |
HK Police Force |
Storage of police water
barriers and metal gates |
|
GLA-TNK 1334 |
Water Supplies Department |
No major site activities
(Project substantially completed) |
|
GLA-TNK 1191&1542 |
Hong Kong Observatory |
Automatic weather station |
List
of Short Term Tenancy (STT)
|
STT No. |
Name of Occupants |
Site Activities |
|
KX2688 |
Goldway Parking Ltd. |
Car-park |
|
KX2345 |
CLP Power Hong Kong Limited |
Storage of construction
materials and plant equipments |
|
KX2662 |
Hong Kong Cricket Association |
Operation of Hong Kong Cricket
Association |
|
KX2628 |
Moral Well International Enterprise Limited |
Car-park |
|
KX2552 |
Era International Investment Limited |
Car-park |
|
KX2629 |
Graceful Ocean Development Limited |
Car-park |
|
KX2261 |
Hong
Kong Aviation Club Ltd. |
Training for air traffic
controllers |
|
KX2574 |
Future Chinese Limited |
Car-park |
|
KX2575 |
Nanjing Limited |
Car-park |
|
KX2117 |
Skyhill Resources Ltd. |
Storage of building materials |
|
KX2109 |
Multi-Light Limited |
1) Concrete production 2) Storage of building materials |
|
KX2675 |
Wang Lee Building Materials Trading Ltd. |
Operation of business in the
recovery and recycling |
|
KX2676 |
Ga Shing Transport
Co. |
Operation of business in the
recovery and recycling |
|
KX2677 |
Chuen Kee Metal Trading
Co Ltd. |
Operation of business in the
recovery and recycling |
|
KX2678 |
Kin Xun
Environment Recycle Ltd |
Operation of business in the
recovery and recycling |
|
KX2569 |
Sureguard Logistics Limited |
Open storage of goods and
dangerous goods |
|
KX2641 |
Citybus Limited |
Parking of buses |
|
KX2642 |
Goldway Parking Ltd. |
Car-park |
|
KX2616 |
CLP Power Hong Kong Limited |
The area has been reinstated
and handed over from CLP to DLO on 30 September 2010 |
1.9
The construction programme showing
the inter-relationship with environmental protection/mitigation measures are
presented in Table 1.3.
Table 1.3
Construction Programme Showing the Inter-Relationship
with Environmental Protection/Mitigation
Measures
|
Construction Works |
Major Environmental Impact |
Control Measures |
|
As
mentioned in Table 1.2 |
Noise,
dust impact, water quality and waste generation |
Sufficient watering of the works site
with active dust emitting activities Properly cover the stockpiles On-site waste sorting and
implementation of trip ticket system Appropriate desilting/sedimentation
devices provided on site for treatment before discharge Use of quiet plant and
well-maintained construction plant Provide movable noise barrier Provide sufficient mitigation
measures as recommended in Approved EIA Report/Lease requirement |
1.10
The
EM&A programme requires construction
noise
monitoring, air quality monitoring,
landscape and visual monitoring and
environmental site audit. The EM&A requirements for each
parameter are described in the following sections, including:
¡P
All
monitoring parameters;
¡P
Action and
Limit levels for all environmental parameters;
¡P
Event
Action Plans;
¡P
Environmental
mitigation measures, as recommended in the Schedule 3 EIA Report; and
¡P
Environmental
requirements in contract documents under Contract No. KLN/2010/04.
1.11
The advice
on the implementation status of environmental protection and pollution
control/mitigation measures is summarized in Section 6 of
this report.
1.12
This report
presents the monitoring results, observations, locations, equipment, period,
methodology and QA/QC procedures of the required monitoring parameters, namely
air quality and noise levels and audit
works for the Project in April 2011.